January 10, 2010

Finish Carpentry and Painting are Underway

Vertical v-groove planks and rafters elevate the beauty of the kitchen ceiling.

Ceiling rafters, wall planks, window and door trim and, of course, cabinetry, are some of the finishing touches that are underway in THE CONCORD GREEN HOME. Care is being taken to use formaldehyde-free wood products, non-toxic paints (Mythic), adhesives and sealers for optimal indoor air quality. A huge thank you to Matt and Patrick of Aedi Construction, and their skilled team of craftsmen.

Close up of trim that frames opening between kitchen and other main living spaces.

Sunny little breakfast nook.

Another view of the kitchen, before island is installed.

Kitchen base cabinet, with glass upper cabinets behind, await paint and installation.

Sweet staircase book nook, which will have a window seat built under soon.

A small dose of painted wainscot planking can go a long way, such as here behind the future Master Bathtub.

Shed dormer windows in the Loft.

A lovely winter view of the park from the Loft.

2 comments:

  1. Great looking built in details. I also like the number and scale of your windows.

    ReplyDelete
  2. I just finished redoing the exterior of my home. I needed to replace all the sidings because most of them were damaged due to last year's hurricane. A friend who works as a siding contractor (Minneapolis) professional suggested that I use sidings made from recyclable materials. After inquiring and researching, I have found that a lot of siding contractors, Minneapolis companies install durable and low maintenance cement fiber sidings which are made from recyclable products.

    Anyway, I can't wait to see the finished model of your kitchen!

    ReplyDelete

Related Posts with Thumbnails